Skip to main content Skip to footer

Planned Preventative Maintenance

Royal Opera House, London

Planned Preventative Maintenance on one of London’s most prestigious buildings.

The design is made up of five large glass sections. Each 5m tall section is laminated and annealed, and the glass is low iron and screen printed. The motor for the automated door is located underground rather than in the head to keep the design clean and minimal.

The structural glass sections are from Spanish manufacturer Cricursa, the aluminium and steel metalwork by Protosheet in Kent, and Erreka Automatic Doors were consulted for the supply of the actuation systems and motors. Applelec Ltd assisted with the lighting, providing an ingenious light sheet solution, utilising organic light emitting diodes.

The entranceway was put through exhaustive testing procedures to make certain that it was up to the rigorous demands required. The glass sections demanded careful specialist handling and GGR devised a special lifting strategy that demanded absolute precision and care.

  • Location: Covent Garden, London
  • Client: Royal Opera House
  • Architect: Stanton Williams
  • Contractor: RISE

Key Features:

  • Revolving Door Planned Preventative Maintenance Service Schedule
  • Anodised Aluminium louvres, pressings and framework maintenanc
  • Oversized curved glass façade and seal maintenance

Get in touch for more information about our services or to find out more about this project.

About the author

Glass Aftercare

Glass Aftercare is the commercial glass maintenance, façade refurbishment and glazing repair specialist. Providing a service you can trust, all across London and the Home Counties.